What minimum items are included in the mock-up room documents for The Standardx franchise?

The_Standardx Franchise · 2025 FDD

Answer from 2025 FDD Document

    1. Mock-up Room Submittal This step shall contain a complete set of all documentation necessary for construction and procurement of the mock-up rooms and corridor mock-up section and shall be submitted to Hyatt at the milestones indicated below. The mock-up room documents will include at minimum the following items, without limitation.
    • Architectural Drawings
    • Interior Design Drawings
    • Lighting Design Drawings
    • MEP Drawings
    • FLS Drawings
    • IT Drawings
    • A/V Drawings
    • Schedules and Specifications
    • Material Samples and Specifications
    • FF&E Layouts
    • FF&E Samples and Specifications.

Unacceptable designs or incomplete submittals may need to be resubmitted. Hyatt will issue a formal review prior to moving onto the next step. A 100% mock-up room document submittal and a mock-up room review and presentation shall be submitted by Franchisee or its Consultants according to the deadlines specified by Hyatt for the Project.

Source: Item 18 — OTHER INCOME (LOSS), NET (FDD pages 187–399)

What This Means (2025 FDD)

According to The Standardx's 2025 Franchise Disclosure Document, the mock-up room submittal requires a complete set of documentation for construction and procurement of mock-up rooms and corridor sections. These documents must be submitted to Hyatt at specified milestones.

The minimum items to be included in the mock-up room documents are architectural drawings, interior design drawings, lighting design drawings, MEP (Mechanical, Electrical, and Plumbing) drawings, FLS (Fire and Life Safety) drawings, IT (Information Technology) drawings, A/V (Audio/Visual) drawings, schedules and specifications, material samples and specifications, FF&E (Furniture, Fixtures, and Equipment) layouts, and FF&E samples and specifications.

The FDD states that unacceptable or incomplete submittals may need to be resubmitted, and Hyatt will issue a formal review before moving to the next step. Franchisees or their consultants must submit a 100% mock-up room document submittal, along with a mock-up room review and presentation, according to Hyatt's deadlines for the project. This thorough review process ensures that the mock-up rooms meet The Standardx's brand standards before full-scale construction and procurement begin.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.