What documentation must be included in The Standardx's schematic design submittal?

The_Standardx Franchise · 2025 FDD

Answer from 2025 FDD Document

    1. Schematic Design Submittal This step shall contain documentation sufficient to review the general building and landscape concept, guest room layouts, public space layouts, and BOH blocking and shall be submitted to Hyatt at the milestones indicated below. The schematic design documents will include at minimum the following items, without limitation.
    • Completed Site Plan
    • Individual Floor Plans
    • All Building Elevations
    • Roof Plan
    • Full Building Cross Section
    • Food Service Equipment Plans
    • Laundry Equipment Plans
    • Operations Basis of Design for Food Service and Laundry including sizing for Laundry
    • MEP, FLS, IT Plans denoting major Systems and Equipment
    • Material Imagery and Samples (inclusive of BOH areas)
    • Furnishings Imagery
    • Exterior Signage schematics

Unacceptable designs or incomplete submittals may need to be resubmitted. Hyatt will issue a formal review prior to moving onto the next step. A 50% schematic design presentation and a 100% schematic design document submittal shall be submitted by Franchisee or its Consultants according to the deadlines specified by Hyatt for the Project.

Source: Item 18 — OTHER INCOME (LOSS), NET (FDD pages 187–399)

What This Means (2025 FDD)

According to The Standardx's 2025 Franchise Disclosure Document, the schematic design submittal requires documentation sufficient to review the general building and landscape concept, guest room layouts, public space layouts, and back of house (BOH) blocking. This submittal is a critical step in the design review process, and The Standardx will formally review it before moving to the next phase. Franchisees must submit both a 50% schematic design presentation and a 100% schematic design document by the deadlines set by The Standardx for the project.

The minimum documentation required for the schematic design submittal includes a completed site plan, individual floor plans, all building elevations, a roof plan, and a full building cross-section. Additionally, franchisees must provide food service equipment plans, laundry equipment plans, and an operations basis of design for food service and laundry, including sizing for laundry. The submittal must also contain MEP (Mechanical, Electrical, Plumbing), FLS (Fire and Life Safety), and IT (Information Technology) plans denoting major systems and equipment.

Furthermore, the schematic design submittal must include material imagery and samples, including those for back-of-house areas, furnishings imagery, and exterior signage schematics. It is important to note that unacceptable designs or incomplete submittals may need to be resubmitted, potentially causing delays in the project timeline. Franchisees should ensure that all required documentation is thorough and accurate to avoid such issues. This comprehensive approach ensures that The Standardx maintains its brand standards and that each new hotel aligns with the company's vision.

Submitting thorough and accurate documentation is crucial for franchisees to avoid delays and ensure compliance with The Standardx's design and construction standards. Franchisees should work closely with their consultants to meet all requirements and deadlines specified by The Standardx.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.