What documentation must be included in the mock-up room submittal for The Standardx?
The_Standardx Franchise · 2025 FDDAnswer from 2025 FDD Document
-
- Mock-up Room Submittal This step shall contain a complete set of all documentation necessary for construction and procurement of the mock-up rooms and corridor mock-up section and shall be submitted to Hyatt at the milestones indicated below. The mock-up room documents will include at minimum the following items, without limitation.
- Architectural Drawings
- Interior Design Drawings
- Lighting Design Drawings
- MEP Drawings
- FLS Drawings
- IT Drawings
- A/V Drawings
- Schedules and Specifications
- Material Samples and Specifications
- FF&E Layouts
- FF&E Samples and Specifications.
Unacceptable designs or incomplete submittals may need to be resubmitted. Hyatt will issue a formal review prior to moving onto the next step. A 100% mock-up room document submittal and a mock-up room review and presentation shall be submitted by Franchisee or its Consultants according to the deadlines specified by Hyatt for the Project.
Source: Item 18 — OTHER INCOME (LOSS), NET (FDD pages 187–399)
What This Means (2025 FDD)
According to The Standardx's 2025 Franchise Disclosure Document, the mock-up room submittal requires a comprehensive set of documents for construction and procurement. This submittal, which includes documentation for both the mock-up rooms and a corridor mock-up section, must be presented to Hyatt at specified milestones.
The documentation includes architectural, interior design, lighting design, MEP (Mechanical, Electrical, and Plumbing), FLS (Fire and Life Safety), IT (Information Technology), and A/V (Audio/Visual) drawings. Additionally, franchisees must provide schedules and specifications, material samples and specifications, FF&E (Furniture, Fixtures, and Equipment) layouts, and FF&E samples and specifications.
It is important to note that incomplete or unacceptable designs may need to be resubmitted, and Hyatt will conduct a formal review before allowing progression to the next stage. Franchisees or their consultants are responsible for submitting a 100% mock-up room document submittal, followed by a mock-up room review and presentation, adhering to the deadlines set by Hyatt for the project. This thorough process ensures that the mock-up room meets The Standardx's standards before full construction proceeds.