What certification regarding the Hotel building's structural integrity must a franchisee provide to Hyatt for The Standardx franchise?
The_Standardx Franchise · 2025 FDDAnswer from 2025 FDD Document
- (b) Provide Hyatt with certification from a qualified, professionally licensed independent structural engineer or firm, certifying that the Hotel building as designed and constructed meets or exceeds all applicable structural requirements, including without limitation seismic, wind, storm and flood, and all other applicable Legal Requirements.
Source: Item 18 — OTHER INCOME (LOSS), NET (FDD pages 187–399)
What This Means (2025 FDD)
According to The Standardx's 2025 Franchise Disclosure Document, a franchisee must provide Hyatt with certification from a qualified, professionally licensed independent structural engineer or firm. This certification must confirm that the hotel building, in its design and construction, meets or exceeds all applicable structural requirements. These requirements include, but are not limited to, seismic, wind, storm, and flood resistance, as well as compliance with all other applicable legal requirements.
This requirement ensures that the hotel building is structurally sound and safe for guests and employees. It also demonstrates that the franchisee has taken the necessary steps to comply with all applicable building codes and regulations. The use of a qualified, professionally licensed independent structural engineer or firm adds credibility to the certification, as these professionals are trained and experienced in assessing structural integrity.
For a prospective The Standardx franchisee, this means incurring the cost of hiring a structural engineer or firm to inspect and certify the building. This cost can vary depending on the size and complexity of the hotel building, as well as the location. It is important for franchisees to factor this cost into their overall budget for the project. Additionally, franchisees should ensure that the structural engineer or firm they hire is qualified and experienced in hotel construction. This will help to ensure that the certification is accurate and reliable.
It is also important to note that Hyatt's review and approval of plans does not relieve the franchisee or its consultants of their responsibility to ensure that the design and construction of the project comply with applicable legal requirements. The franchisee remains solely responsible for the quality of workmanship and the suitability of the plans, specifications, and design data for the project.