factual

What must a Big Apple Bagels franchisee do with the drawings and specifications provided by Big Apple Bagels?

Big_Apple_Bagels Franchise · 2025 FDD

Answer from 2025 FDD Document

BAB provides you basic drawings and specifications for the development of a BAGELS Store. You must take these drawings and specifications to a licensed architect who will modify them, if required, to meet applicable ordinances, buildings codes or permit requirements. BAB must approve any such modifications to the drawings and specifications (Paragraph 3.b, Franchise Agreement).

Source: Item 11 — FRANCHISOR'S ASSISTANCE, ADVERTISING, COMPUTER SYSTEMS AND TRAINING (FDD pages 42–53)

What This Means (2025 FDD)

According to Big Apple Bagels' 2025 Franchise Disclosure Document, Big Apple Bagels provides franchisees with basic drawings and specifications for developing their Big Apple Bagels store. The franchisee is then required to take these drawings and specifications to a licensed architect.

The architect's role is to modify the drawings and specifications as necessary to comply with local ordinances, building codes, and permit requirements. This step ensures that the store's design and construction adhere to all applicable legal and regulatory standards in the specific location.

Any modifications made by the architect to the original drawings and specifications must be submitted to Big Apple Bagels for approval. This requirement allows Big Apple Bagels to maintain brand consistency and ensure that all stores meet their standards, even while adhering to local regulations.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.