What standards must the construction plans and specifications for a Pump It Up Premises comply with?
Pump_It_Up Franchise · 2025 FDDAnswer from 2025 FDD Document
It is your responsibility to prepare, for our review, a site survey of the proposed Premises and all required construction plans and specifications to suit the Premises and to make sure that the plans and specifications comply with the Americans with Disabilities Act ("ADA") and similar rules governing public accommodations for persons with disabilities, and other applicable local ordinances, building codes and permit requirements.
Source: Item 1 — The Franchisor and any Parents, Predecessors, and Affiliates (FDD pages 9–12)
What This Means (2025 FDD)
According to the 2025 Pump It Up FDD, franchisees are responsible for preparing a site survey and all required construction plans and specifications for the Premises, which are subject to the franchisor's review. These plans and specifications must comply with several standards.
Specifically, the construction plans and specifications must adhere to the Americans with Disabilities Act (ADA) and similar rules that govern public accommodations for individuals with disabilities. This ensures that the Pump It Up facility is accessible to all customers, regardless of their physical abilities. Additionally, the plans must comply with other applicable local ordinances, building codes, and permit requirements. These regulations vary by location and cover aspects such as structural integrity, fire safety, and zoning regulations.
It is the franchisee's responsibility to ensure compliance with all these standards. Pump It Up recommends consulting with an attorney and local, state, and federal government agencies to determine all legal requirements and their potential impact on the franchisee and the cost of compliance. This proactive approach helps franchisees avoid potential legal issues and ensures the facility meets all necessary safety and accessibility standards.
Furthermore, the FDD mentions that the Arenas within a Pump It Up facility should have ceiling heights of at least 18 feet and must meet all local code and use requirements to accommodate the play equipment. This highlights the importance of adhering to specific design and construction standards to maintain the brand's operational model and customer experience.