Does Moes Southwest Grill charge for the first on-site construction inspection?

Moes_Southwest_Grill Franchise · 2025 FDD

Answer from 2025 FDD Document

(the "Architectural Plans") at no cost and our review of one revised set of Architectural Plans that incorporate our required changes at no cost, we may charge a fee of $2,500 for each set of drawings we review that include any other modification

Source: Item 5 — Initial Fees (FDD pages 28–30)

What This Means (2025 FDD)

According to Moes Southwest Grill's 2025 Franchise Disclosure Document, the franchisor may inspect a franchisee's site during construction. However, Moes Southwest Grill does not charge for the first on-site construction inspection.

For any second or subsequent inspection, Moes Southwest Grill may charge an inspection fee of $2,500. This fee covers the cost of the additional inspection and is charged at the franchisor's discretion.

This policy is relatively common in the franchise industry, as franchisors often provide an initial inspection at no cost to ensure the location meets brand standards. Charging for subsequent inspections incentivizes franchisees to adhere to the approved plans and address any issues promptly, potentially saving both the franchisee and Moes Southwest Grill from future complications or costs.