What is the purpose of Itan's review of the final construction plans?
Itan Franchise · 2025 FDDAnswer from 2025 FDD Document
You must submit the final construction plans to us for approval.
The limited purpose of our review is to verify the construction plans are consistent with our system standards.
Source: Item 23 — RECEIPT (FDD pages 44–190)
What This Means (2025 FDD)
According to Itan's 2025 Franchise Disclosure Document, the purpose of Itan's review of the final construction plans is limited to verifying that the plans are consistent with Itan's system standards. This means Itan is primarily concerned with ensuring the construction aligns with their established brand image, operational requirements, and overall franchise model.
For a prospective franchisee, this implies that while they are responsible for hiring a licensed and bonded architect to create the construction plans, those plans must adhere to Itan's specifications. The franchisee must submit these final construction plans to Itan for approval. This process ensures uniformity across all Itan locations, maintaining brand consistency and customer experience.
It is important to note that the franchisee bears the sole expense of constructing and equipping the premises according to the approved plans and the specifications outlined in Itan's Manual. This includes purchasing or leasing and installing all required equipment, fixtures, signs, and other items that Itan requires. Therefore, franchisees should carefully review the Manual and any attachments to understand the full scope of required modifications and improvements to avoid unexpected costs or delays during construction.