What is the timeframe that Goldfish Swim School requires between the issuance of the certificate of occupancy and the opening date?
Goldfish_Swim_School Franchise · 2025 FDDAnswer from 2025 FDD Document
- 5.6.1.7 obtain Franchisor's permission and approval of an opening date, providing a reasonable time (10 – 14 days) between the issuance of Franchisee's certificate of occupancy or similar document and Franchisee's opening date. Franchisor's approval of the opening date shall be based on Franchisor's determination that Franchisee is ready to open and satisfactorily prepared to operate;
Source: Item 23 — RECEIPTS (FDD pages 77–389)
What This Means (2025 FDD)
According to the 2025 Goldfish Swim School Franchise Disclosure Document, before opening a franchised swim school, a franchisee must obtain Goldfish Swim School's permission and approval of an opening date. Goldfish Swim School requires a reasonable time, specifically 10 to 14 days, between the issuance of the certificate of occupancy and the opening date.
Goldfish Swim School's approval of the opening date is based on its determination that the franchisee is ready to open and satisfactorily prepared to operate the swim school. This timeframe allows the franchisee to finalize preparations, train staff, and ensure all operational aspects are in place before welcoming customers.
This requirement ensures that franchisees are adequately prepared before commencing operations, which can contribute to a smoother launch and better customer experience. It also protects the Goldfish Swim School brand by ensuring consistent quality and service standards from all locations.