factual

Regarding MSS deployment for Even Hotels, what site preparation activities is the Eligible Participant responsible for performing?

Even_Hotels Franchise · 2025 FDD

Answer from 2025 FDD Document

  • (c) Eligible Participant will perform all Site preparation activities including, but not limited to, power, core drilling, ventilation, proper environmental as per the Equipment manufacturer's specifications.

Source: Item 23 — RECEIPTS (FDD pages 99–438)

What This Means (2025 FDD)

According to Even Hotels' 2025 Franchise Disclosure Document, the Eligible Participant is responsible for all site preparation activities related to MSS deployment. These activities include, but are not limited to, providing power, core drilling, ventilation, and ensuring proper environmental conditions as per the equipment manufacturer's specifications.

This means that as an Even Hotels franchisee, you will need to ensure that the physical location of your hotel is properly prepared to accommodate the MSS equipment. This involves making sure the site has the necessary power supply, drilling any necessary holes for cable or equipment installation, ensuring adequate ventilation to prevent overheating, and maintaining the environmental conditions (temperature, humidity, etc.) recommended by the equipment manufacturer.

Failure to properly prepare the site could result in delays in the deployment of the MSS, potential damage to the equipment, and additional costs for the franchisee. It is important to carefully review the equipment manufacturer's specifications and coordinate with qualified contractors to ensure that all site preparation activities are completed correctly.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.