What are 'Designs' in the context of an Embassy Suites By Hilton franchise?
Embassy_Suites_By_Hilton Franchise · 2025 FDDAnswer from 2025 FDD Document
Plans Submission Dates:
Preliminary Plans: [Due four (4) months from the Effective Date]
Design Development (50%) Plans and Specifications:
Final (100%) Plans and Specifications:
Source: Item 22 — CONTRACTS (FDD page 97)
What This Means (2025 FDD)
According to the 2025 Embassy Suites By Hilton Franchise Disclosure Document, the term 'design' relates to the plans and specifications required for the hotel's construction and layout. Specifically, the FDD mentions 'Design Development (50%) Plans and Specifications' and 'Final (100%) Plans and Specifications,' indicating a phased submission process. Franchisees must submit preliminary plans four months from the effective date of the agreement.
These design specifications are part of the broader 'Standards' that Embassy Suites By Hilton establishes for its hotels. These standards encompass various aspects, including construction, renovation, appearance, equipping, and furnishing. The design plans ensure that the hotel aligns with the brand's overall image and operational requirements.
For a prospective Embassy Suites By Hilton franchisee, understanding these design requirements is crucial. It dictates the timeline for submitting plans and the level of detail required at each stage. Failing to meet these design standards could result in delays or non-compliance, impacting the hotel's opening and operation. Therefore, franchisees should carefully review the Franchise Agreement and Manual to fully grasp the design-related obligations and deadlines.