What street address must be included in the survey for a Dq Treat location?
Dq_Treat Franchise · 2025 FDDAnswer from 2025 FDD Document
PAR will perform a Pre-Installation Site Survey at existing Participating Locations in advance of the POS solution installation. Refer to the Dairy Queen PAR Site Survey Form as set forth in the Installation Guide. Pre-Installation Site Survey services include the following:
- 1.1.1. Schedule the site survey with a representative of the Participating Location, at the Participating Location, to occur at least 6 weeks before the POS installation date.
- 1.1.2. Visually inspect and certify existing Participating Location network cabling as necessary.
- 1.1.3. Capture images of existing equipment placement.
- 1.1.4. Collect store measurements pertinent to future equipment that will be installed during POS installation.
- 1.1.5. Validate required quantity and placement of permanent electrical outlets available for the PAR POS system installation.
- 1.1.6. Record the kitchen display station each menu item group will route to as specified in the Dairy Queen PAR Site Survey Form as set forth in the Installation Guide.
- 1.1.6.1. Review the survey results and Dairy Queen Site Readiness Checklist as set forth in the Installation Guide with the Participating Location at the completion of the survey process.
- 1.1.7. Within approximately three business days of completing the Pre-Installation Site Survey, provide:
- 1.1.7.1. an electronic copy of the completed Dairy Queen PAR Site Survey Form to the Participating Location, including a list of any necessary work or modifications that are outside of the scope of PAR's Installation Services, and dates by which such work or modifications must be completed to meet the anticipated installation date; and
- 1.1.7.2. a detailed estimate of the anticipated charges for any and all Installation Services PAR anticipates performing, customized for that Participating Location, and clearly defining which of those services the Participating Location may perform themselves or contract to another provider.
- 1.1.8. Perform surveys on Sundays, Mondays, Tuesdays, Wednesdays, Thursdays, and Fridays as PAR technician availability dictates.
Source: Item 17 — The following paragraph is added to the end of Item 17 of the Disclosure Document: (FDD pages 70–378)
What This Means (2025 FDD)
According to the 2025 Dq Treat FDD, a Pre-Installation Site Survey is performed at existing Participating Locations before the POS solution installation. As part of this survey, the street address of the Dq Treat location must be included. The survey is scheduled with a representative of the Participating Location and occurs at the Participating Location.
The Pre-Installation Site Survey includes visually inspecting and certifying existing Participating Location network cabling, capturing images of existing equipment placement, collecting store measurements pertinent to future equipment installation, validating the quantity and placement of electrical outlets, and recording the kitchen display station each menu item group will route to. The survey results and Dairy Queen Site Readiness Checklist are reviewed with the Participating Location upon completion of the survey process.
Within approximately three business days of completing the Pre-Installation Site Survey, an electronic copy of the completed Dairy Queen PAR Site Survey Form is provided to the Participating Location. This form includes a list of any necessary work or modifications that are outside of the scope of PAR's Installation Services, and dates by which such work or modifications must be completed to meet the anticipated installation date. A detailed estimate of the anticipated charges for any and all Installation Services PAR anticipates performing, customized for that Participating Location, is also provided, clearly defining which of those services the Participating Location may perform themselves or contract to another provider.
The surveys are performed on Sundays, Mondays, Tuesdays, Wednesdays, Thursdays, and Fridays as PAR technician availability dictates. This thorough process ensures that the Dq Treat location is properly prepared for the POS system installation.