factual

What is the deadline for Dq Treat Participating Locations to complete necessary work or modifications identified in the Dairy Queen PAR Site Survey Form to meet the anticipated POS installation date?

Dq_Treat Franchise · 2025 FDD

Answer from 2025 FDD Document

  • 1.1.7. Within approximately three business days of completing the Pre-Installation Site Survey, provide:
    • 1.1.7.1. an electronic copy of the completed Dairy Queen PAR Site Survey Form to the Participating Location, including a list of any necessary work or modifications that are outside of the scope of PAR's Installation Services, and dates by which such work or modifications must be completed to meet the anticipated installation date; and

Source: Item 17 — The following paragraph is added to the end of Item 17 of the Disclosure Document: (FDD pages 70–378)

What This Means (2025 FDD)

According to Dq Treat's 2025 Franchise Disclosure Document, after the Pre-Installation Site Survey, PAR provides an electronic copy of the completed Dairy Queen PAR Site Survey Form to the Participating Location. This form includes a list of any necessary work or modifications that are outside of PAR's Installation Services.

The critical point for Dq Treat franchisees is that this form also specifies the dates by which all identified work or modifications must be completed. This deadline is set to ensure that the location is fully prepared for the anticipated POS installation date.

Therefore, a Dq Treat franchisee needs to pay close attention to the Dairy Queen PAR Site Survey Form and the associated deadlines to avoid any delays in the POS system installation, which could impact their store's operations.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.