factual

What responsibilities does an Eligible Participant at a Crowne Plaza have regarding site preparation activities, including power, core drilling, and ventilation?

Crowne_Plaza Franchise · 2025 FDD

Answer from 2025 FDD Document

  • (c) Eligible Participant will perform all Site preparation activities including, but not limited to, power, core drilling, ventilation, proper environmental as per the Equipment manufacturer's specifications.
  • (d) Eligible Participant will provide to AT&T the login and password information to all equipment that is related to the MSS provided in this SOW, including both basic access and modification access.
  • (e) Eligible Participant will assume responsibility for the network infrastructure upon completion of the Services provided in this SOW.
  • (f) Eligible Participant is responsible to reboot the Covered Device after the system receives patches from the patching application. AT&T cannot be held responsible for the Service performance if the Covered Devices are not rebooted after a patch is loaded.
  • (g) Eligible Participant will provide IP connectivity to the primary interfaces of the software at all other locations.

Source: Item 23 — Receipts (FDD pages 100–424)

What This Means (2025 FDD)

According to the 2025 Crowne Plaza FDD, an Eligible Participant is responsible for all site preparation activities. This includes, but is not limited to, providing power, core drilling, ventilation, and ensuring proper environmental conditions as per the equipment manufacturer's specifications.

In addition to site preparation, the Eligible Participant must provide AT&T with login and password information for all equipment related to the MSS (Managed Security Services) provided, including both basic and modification access. The Eligible Participant also assumes responsibility for the network infrastructure upon completion of the services outlined in the agreement. Furthermore, they are responsible for rebooting the Covered Device after the system receives patches from the patching application, as AT&T will not be held responsible for service performance if the devices are not rebooted after patching.

Finally, the Eligible Participant must provide IP connectivity to the primary interfaces of the software at all other locations. These responsibilities are critical for ensuring the proper setup and ongoing maintenance of the technology systems used within the Crowne Plaza franchise.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.