At least 120 days before the Hotel opening date, Licensee will acquire the Hardware, Software, and communications capabilities specified in the Minimum Configuration.

In addition, at least 120 days before the Hotel opening date, Licensee will enter into the Participation Agreements for the Additional Required Services.

Source: Item 23 — Receipts (FDD pages 100–424)

What This Means (2025 FDD)

According to Crowne Plaza's 2025 Franchise Disclosure Document, a licensee must acquire the specified Hardware, Software, and communications capabilities at least 120 days before the hotel opening date. This requirement ensures that the hotel has the necessary technology infrastructure in place before it begins operations. Additionally, the licensee must enter into Participation Agreements for Additional Required Services at least 120 days before the hotel opening date.

Furthermore, the licensee is responsible for preparing the site for the installation and operation of the hardware. This includes providing the required electrical connections, power outlets, air conditioning, patch panel, and local area network cable installation. If the site preparation is not completed to IHG's satisfaction in a timely manner, the licensee may be charged $2,600, which may be modified by IHG. Proper site preparation is essential for the hardware's performance, and no hardware will be installed until the site is adequately prepared.

Crowne Plaza may update the Minimum Configuration, requiring the licensee to purchase and install then-current approved Software and approved Hardware within 90 days (or a period specified by IHG in writing) of the update. The licensee is also responsible for decommissioning any hardware and software that is no longer approved, all at the licensee's expense. IHG may install a wide area network (WAN) and WAN Hardware for the hotel's use, with the licensee required to purchase broadband Internet access to establish the primary WAN link.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.