factual

When undertaking a Scrape/Rebuild RTF Remodel for a Burger King franchise, what approvals are required before submitting for jurisdictional review or going to permit?

Burger_King Franchise · 2025 FDD

Answer from 2025 FDD Document

Site plan approval from the Site Engineering Team is required prior to submitting for jurisdictional review or going to permit. Design package approval from the Design Team is required prior to submitting for jurisdictional review or going to permit.

  • Double Drive-Thru (Refer to Drive-Thru Standards)
  • Lighting Upgrade to LED (Refer to Lighting Guidelines)
  • Landscaping Upgrade (Refer to Landscape Guidelines)
  • Seal and Stripe Parking Lot
  • Current Brand Signage (Refer to Signage Guidelines)
  • Directional signs, Clearance Bars (Refer to Drive-Thru Standards)
  • Drive-Thru Equipment layout optimization
  • Trash Enclosure Modernize | Optimize
  • Adhere to ADA Compliance
  • Safely and efficiently demolish existing building and structure carefully preserving utilities as needed
  • Site condition assessment to determine new building location (zoning requirement, vehicular flow, visibility)
    1. Exterior Design

Design package approval from the Design Team is required prior to submitting for jurisdictional review or going to permit.

  • Follow Prototype Building Design Package
    1. Interior Design

Design package approval from the Design Team is required prior to submitting for jurisdictional review or going to permit.

Follow Decor Design Package

Source: Item 20 — OUTLETS AND FRANCHISEE INFORMATION (FDD pages 109–124)

What This Means (2025 FDD)

According to Burger King's 2025 Franchise Disclosure Document, when undertaking a Scrape/Rebuild RTF Remodel, a franchisee must obtain both site plan approval from the Site Engineering Team and design package approval from the Design Team before submitting for jurisdictional review or going to permit. This requirement applies to the site, exterior design, and interior design aspects of the remodel. This ensures that the new construction aligns with Burger King's standards and local regulations right from the start.

For the site, franchisees need to get the site plan approved by the Site Engineering Team before moving forward with jurisdictional reviews or permits. This suggests that Burger King wants to ensure the overall layout and functionality of the location meets their standards before the franchisee invests further in the process.

Similarly, for both the exterior and interior design, the design package must be approved by the Design Team before submitting for jurisdictional review or obtaining permits. This indicates that Burger King maintains tight control over the brand's image and customer experience, ensuring consistency across all locations. Franchisees need to carefully follow the prototype and decor design packages to meet these requirements.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.