During what training phase are the 'Opening Procedures' for a Big Air Trampoline Park location covered?
Big_Air_Trampoline_Park Franchise · 2025 FDDAnswer from 2025 FDD Document
| Daily Operation of a Big Air Trampoline Park | 1 |
|---|---|
| Operational Checklists | 1 |
| Using Checklists | 1 |
| Opening Procedures | 2 |
| Closing Procedures | |
| Operating the Big Eats Concession | 3 |
| Daily Operational Checklists for Big Eats3 | |
| Food Safety3 | |
| Inventory | |
| Inventory Counting Categories4 | |
| Strict Counting4 | |
| Estimating4 | |
| Weighing4 | |
| Taking Inventory5 | |
| Pre-counts5 | |
| Daily Accounting Procedures | 5 |
| POS Systems | 5 |
| Making the Daily Bank Deposit | 6 |
| Cashier Procedures | 6 |
| Big Air Trampoline Park Daily Responsibilities | 9 |
| Court Attendants | |
| Supervisors | |
| Reports | |
| Weekday and Weekend Shifts11 | |
| Rotation11 | |
| Main Court | 12 |
| Safety Rules | |
| Main Court Operations | 13 |
| Entrance/Exit13 | |
| Watching the Court13 |
Source: Item 11 — FRANCHISOR'S ASSISTANCE, ADVERTISING, COMPUTER SYSTEMS, AND TRAINING (FDD pages 26–34)
What This Means (2025 FDD)
According to the 2025 Big Air Trampoline Park FDD, opening procedures are covered during the 'Daily Operation of a Big Air Trampoline Park' training phase. The FDD excerpt includes a table outlining various operational topics and the corresponding training phase in which they are addressed. 'Opening Procedures' are specifically listed under the 'Daily Operation of a Big Air Trampoline Park' category, which is designated as training phase '2'.
This means that franchisees and their staff will receive instruction on the correct steps and protocols for opening the Big Air Trampoline Park location as part of the second training phase. This likely includes tasks such as preparing the facility for customers, conducting safety checks, and setting up point-of-sale systems. Understanding these procedures is crucial for ensuring a smooth and safe start to each business day.
Prospective franchisees should pay close attention to the content covered in training phase 2 to ensure they are fully prepared to manage the opening of their Big Air Trampoline Park location effectively. They may also want to inquire about the specific details of the opening procedures and any updates or changes to these procedures that may not be explicitly detailed in the FDD.