Can a Beem Light Sauna franchisee begin construction before receiving written approval of the Plans?
Beem_Light_Sauna Franchise · 2025 FDDAnswer from 2025 FDD Document
You must provide us with written notice identifying your proposed general contractor, and you must ensure that the contractor is duly licensed in your jurisdiction and adequately insured.
You may not begin construction until we have given you written approval of the Plans and we have approved in writing your choice of general contractor.
Source: Item 23 — RECEIPT (FDD pages 71–230)
What This Means (2025 FDD)
According to Beem Light Sauna's 2025 Franchise Disclosure Document, a franchisee cannot begin construction until they have received written approval of the Plans from the franchisor. Additionally, Beem Light Sauna must also provide written approval of the franchisee's choice of general contractor before construction can commence.
Prior to submitting the Plans for permitting, the franchisee must have Beem Light Sauna review and approve the architectural drawings and specifications for the construction of the studio. These Plans should include all leasehold improvements, interior designs, and elevations developed by the franchisee's contractors. Furthermore, the franchisee must provide written notice to Beem Light Sauna identifying their proposed general contractor, ensuring the contractor is duly licensed and adequately insured in their jurisdiction.
This requirement ensures that the Beem Light Sauna studio is built according to the franchisor's standards and specifications, maintaining brand consistency and quality control. For a prospective franchisee, this means they must factor in the time required for plan review and approval by Beem Light Sauna before starting construction. Failure to obtain these approvals could result in construction delays and potential non-compliance with the franchise agreement.