Does Beehive Homes need to approve the location selected for a Beehive Homes franchise?
Beehive_Homes Franchise · 2025 FDDAnswer from 2025 FDD Document
- B.
YOU select, with OUR approval, the location of YOUR Bee Hive Home.
In determining whether to approve any particular site WE will consider things like: analysis of traffic patterns, both vehicular and pedestrian; proximity to grocery or retail stores; population, age and income demographics; and proximity to competing businesses.
If YOU are unable to find a location that meets the requirements for a HOME in six months, YOUR franchise agreement will be terminated and any franchise fees paid will be refunded to YOU.
Approval by US is not a representation or endorsement to YOU of successful operation of a franchise.
WE do not own any premises for lease to franchisees.
YOU are responsible for conforming YOUR site to applicable ordinances, codes and zoning. (paragraph 7.1 of the Franchise Agreement)
- C.
The typical length of time between the signing of the Franchise Agreement with the accompanying payment of one-third (1/3) of the initial franchise fee and the opening of YOUR Bee Hive Home can vary greatly, up to 18 months to 30 months.
Factors affecting this length of time usually include obtaining a satisfactory location, financing arrangements, finalizing architectural plans conforming with applicable building codes, local zoning and ordinance compliance, permitting, site improvement, construction of the Home and delivery and installation of decor, fixtures and equipment.
Healthcare licensing and certification of the Home and employees does not generally cause any significant delays in the process.
Source: Item 11 — FRANCHISOR'S ASSISTANCE, ADVERTISING, COMPUTER SYSTEMS AND TRAINING (FDD pages 17–21)
What This Means (2025 FDD)
According to Beehive Homes' 2025 Franchise Disclosure Document, franchisees are required to obtain franchisor approval for their chosen location. Beehive Homes will assess potential sites based on factors such as traffic patterns (vehicular and pedestrian), proximity to retail stores, population demographics (age and income), and the presence of competing businesses. This approval process is designed to ensure that the location aligns with Beehive Homes' standards and has the potential for success.
If a prospective Beehive Homes franchisee is unable to secure a suitable location that meets the franchisor's requirements within six months, the franchise agreement may be terminated. In such cases, any franchise fees already paid will be refunded. However, Beehive Homes clarifies that their approval of a site does not constitute a guarantee or endorsement of the location's future operational success. The franchisee remains responsible for ensuring the site complies with all applicable local ordinances, codes, and zoning regulations.
The FDD also states that the time between signing the Franchise Agreement and opening the Beehive Homes location can range from 18 to 30 months. This timeframe depends on various factors, including securing a satisfactory location, arranging financing, finalizing architectural plans, complying with local zoning and building codes, obtaining necessary permits, completing site improvements, constructing the building, and installing fixtures and equipment. Healthcare licensing and certification typically do not cause significant delays in this process.