Under what condition is the Compliance Drawing Fee payable to Basecamp Fitness?
Basecamp_Fitness Franchise · 2025 FDDAnswer from 2025 FDD Document
require you to pay the $40,000 to us and we will execute the Grand Opening Program.
ITEM 6 OTHER FEES
| Type of Fee | Amount (Note 1) | Due Date | Remarks |
|---|---|---|---|
| Insufficient Funds Fee | $100 per check that you submit to us that is returned for ins |
Source: Item 6 — OTHER FEES (FDD pages 17–24)
What This Means (2025 FDD)
According to Basecamp Fitness's 2025 Franchise Disclosure Document, the Compliance Drawing Fee is payable if a franchisee requires additional compliance drawings. The fee is $250 for each additional drawing requested. This fee is incurred as needed, meaning it is not a recurring or mandatory fee, but rather one that arises from a specific request by the franchisee.
For a prospective Basecamp Fitness franchisee, this means that the initial franchise fee covers a certain number of compliance drawings. However, if the franchisee needs more drawings than initially provided, they will be responsible for paying $250 for each additional drawing. This could occur if the franchisee makes changes to the studio layout or design that require additional review and approval by Basecamp Fitness to ensure compliance with brand standards and local regulations.
It is important for potential franchisees to understand what is included in the initial franchise offering regarding compliance drawings and to budget accordingly if they anticipate needing additional drawings. Franchisees should discuss with Basecamp Fitness the typical number of drawings required and the circumstances under which additional drawings might be necessary to avoid unexpected costs.