ou begin construction of your Basecamp Studio, we will provide you with a prototype floor plan, as well as a list of the equipment, displays, fixtures and furnishings for your studio. It will then be your obligation to conform the prototype plans to your space, and to construct your premises in accordance with the provisions of this Agreement in compliance with all local laws.

  • C. Compliance Drawing. Before you begin construction of your Basecamp Studio, we will create a specific studio layout/design for your Basecamp Studio (a "Compliance Drawing"). If, however, you would like additional Compliance Drawing, you must pay us our then-current fee per Drawing.
  • D. Construction Documents. You must retain our designated architectural vendor to create a complete set of detailed construction documents and to complete construction of your facility in compliance with our mandatory specifications ("Construction Documents"), and to obtain any required permits, and conform the premises to local ordinances or building codes.
  • E. Initial Training. We will, at our expense, provide an initial training program to the person you designate as the "Principal Operator" (whether you, if you are an individual, or one of your owners if you are an entity) of your Basecamp Studio and your Studio Manager.

Source: Item 22 — CONTRACTS (FDD pages 61–62)

What This Means (2025 FDD)

According to Basecamp Fitness's 2025 Franchise Disclosure Document, the Compliance Drawing serves as a specific studio layout and design created by Basecamp Fitness for the franchisee's studio. Before construction begins, Basecamp Fitness will provide this drawing to the franchisee. The franchisee is required to supply accurate site information, including as-built drawings, surveys, technical data, construction documents, and site plans, to enable Basecamp Fitness to create the Compliance Drawing.

The franchisee must develop their Basecamp Studio in accordance with the Compliance Drawing, as well as applicable laws, regulations, codes, and Basecamp Fitness's mandatory specifications. The franchisee cannot commence construction until they have received written consent from Basecamp Fitness regarding the actual design of their studio. This ensures that the studio's design aligns with Basecamp Fitness's brand standards and operational requirements.

If a franchisee chooses not to use Basecamp Fitness's designated architectural vendor for the Construction Documents, they may be charged a fee to have their Construction Documents reviewed and approved by Basecamp Fitness. For a franchisee's first Basecamp Studio, Basecamp Fitness may require the franchisee to obtain Construction Documents from their designated architectural vendor. Overall, the Compliance Drawing and related processes are in place to maintain uniformity and adherence to brand standards across all Basecamp Fitness locations.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.