What is the cost for each additional Compliance Drawing from Basecamp Fitness?
Basecamp_Fitness Franchise · 2025 FDDAnswer from 2025 FDD Document
require you to pay the $40,000 to us and we will execute the Grand Opening Program.
ITEM 6 OTHER FEES
| Type of Fee | Amount (Note 1) | Due Date | Remarks |
|---|---|---|---|
| Insufficient Funds Fee | $100 per check that you submit to us that is returned for ins |
Source: Item 6 — OTHER FEES (FDD pages 17–24)
What This Means (2025 FDD)
According to Basecamp Fitness's 2025 Franchise Disclosure Document, franchisees must pay $250 for each additional compliance drawing. This fee is incurred if a franchisee requires additional compliance drawings beyond what is initially provided.
Compliance drawings are likely related to the architectural plans and specifications required to build out a Basecamp Fitness studio. These drawings ensure that the studio design adheres to the franchisor's brand standards, local building codes, and other regulatory requirements. The initial franchise fee may cover a standard set of compliance drawings, but if the franchisee needs modifications or additional drawings due to specific site conditions or personal preferences, this additional fee will apply.
This fee is payable as incurred, meaning the franchisee will need to pay the $250 fee each time an additional drawing is requested. Franchisees should factor this potential cost into their budget, especially if they anticipate needing customized studio designs or if their chosen location presents unique construction challenges. Understanding the scope of the initial compliance drawings included in the franchise agreement and anticipating potential needs for additional drawings can help franchisees manage their expenses effectively.