What is the range of the design and construction assistance expense for a Bananas Smoothies Frozen Yogurt franchise?
Bananas_Smoothies_Frozen_Yogurt Franchise · 2025 FDDAnswer from 2025 FDD Document
cture_0.jpeg)
| Type of Fee 1 | Amount | Due Date | Remarks |
|---|---|---|---|
| We may increase the required minimum, but in no case shall the Fund be increased to more than a total of 3% of Gross Sales. | |||
| Site evaluation | Out-of-pocket expenses for visiting and inspecting proposed site | As incurred | Payable only if on-site inspection of proposed site is necessary. We reserve the right to charge a fee for conducting evaluations although a fee is not imposed at this time. 5 |
| Design and construction assistance expense | $250 - $750 | As incurred | For out-of-pocket expenses incurred in connection with replicating and shipping architectural and constru |
Source: Item 6 — OTHER FEES (FDD pages 17–19)
What This Means (2025 FDD)
According to Bananas Smoothies Frozen Yogurt's 2025 Franchise Disclosure Document, franchisees can expect to pay between $250 and $750 for design and construction assistance. This expense covers the franchisor's out-of-pocket costs for replicating and shipping architectural and construction plans. This fee is incurred as needed during the construction phase of setting up the franchise.
This fee is relatively modest compared to the overall investment required to open a Bananas Smoothies Frozen Yogurt franchise. It is important for prospective franchisees to factor this cost into their initial budget and understand when it is due. The FDD specifies that this fee is due as incurred, meaning it will likely be required at various stages during the design and construction process.
Franchisees should communicate closely with Bananas Smoothies Frozen Yogurt to understand the specific services covered by this fee and to ensure they receive the necessary architectural and construction plans in a timely manner. Understanding the scope of this assistance can help streamline the build-out process and avoid potential delays or misunderstandings. It is also advisable to confirm whether this fee is a one-time charge or if additional expenses related to design and construction assistance may arise during the franchise term.