factual

When is the preassessment construction/remodeling review of a Bambu shoppe scheduled?

Bambu Franchise · 2025 FDD

Answer from 2025 FDD Document

de consultation, onboarding, and opening support as scheduled and as needed, in our sole discretion. There will be scheduled a preassessment construction/remodeling review of your shoppe and an owner orientation, conducted after you sign your lease. Approximately two days will be an owners training at a designated Bambū shoppe location conducted before your opening training is scheduled. Approximately one day will involve a shoppe pre-opening assessment. If we determine during our preassessment that the shoppe is not prepared for training and soft opening, we will reschedule the remainder of the training and charge for the additional costs incurred for travel cancellation and other additional expenses incurred by us. Approximately seven and a half days for shoppe staff observation, guidance and consultation on-site at your shoppe at or around the time your shoppe commences operation, with soft-opening support. (Sections 6.2 and 7.1.a of the Franchise Agreement.)

Source: Item 11 — Franchisor's Assistance, Advertising, Computer Systems, and Training (FDD pages 28–38)

What This Means (2025 FDD)

According to Bambu's 2025 Franchise Disclosure Document, a preassessment construction/remodeling review of your shoppe is scheduled after you sign your lease. This review is part of the consultation, onboarding, and opening support that Bambu provides.

Additionally, Bambu conducts a preassessment review of your shoppe approximately one to two weeks prior to your soft opening to determine if onsite training can be scheduled. If Bambu determines during the preassessment that the shoppe is not prepared for training and soft opening, they will reschedule the remainder of the training and charge you for the additional costs incurred for travel cancellation and other additional expenses.

Bambu also requires you to notify them when you have passed your Environmental Health Department Inspection, which typically takes place as the buildout of your Bambu shoppe nears completion. This notification allows them to schedule the opening training. Furthermore, Bambu will provide a written list of anything that must be done or changed before opening or promptly after opening during the preassessment review.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.