Is promptly commencing construction of the premises a requirement for meeting B Bops' estimated opening times?

B_Bops Franchise · 2025 FDD

Answer from 2025 FDD Document

Start-Up Period. The Company estimates that the approximate length of time between payment of the deposit and opening of the Franchise (assuming your application is approved) will be six (6) to twelve (12) months, and between execution of the Franchise Agreement and opening of the Franchise will be four (4) to nine (9) months, assuming in both cases that you promptly commence construction of the Franchise premises. The length of the start-up period is subject to variation, however, and the Company is consequently unable to provide any assurance that the Franchise will be open for business within the estimated period. Numerous factors affect the length of the start-up period, including, without limitation, the ability to locate and secure a satisfactory site through lease or purchase, obtaining acceptable financing, construction of the Franchise premises, obtaining building permits, complying with zoning and local ordinances and

delivery and installation of equipment, fixtures and signage. The Franchise premises is subject to inspection and approval by the Company prior to the commencement of operations. In the event the Company determines that construction of the Franchise premises has not proceeded in accordance with the Company's plans and specifications, the Company is entitled to delay the opening of the Franchise until such time as you have made the necessary corrections at your expense.

Building Design and Construction.

Source: Item 11 — FRANCHISOR'S ASSISTANCE, ADVERTISING, COMPUTER SYSTEMS AND TRAINING (FDD pages 25–33)

What This Means (2025 FDD)

According to B Bops's 2025 Franchise Disclosure Document, promptly starting construction is a key factor in meeting the estimated opening times for a franchise. B Bops estimates that the time between paying the deposit and opening the franchise will be six to twelve months, assuming the application is approved. The time between executing the Franchise Agreement and opening the franchise is estimated to be four to nine months. Both estimates depend on the franchisee promptly commencing construction of the franchise premises.

However, the document states that the length of the start-up period can vary, and B Bops cannot guarantee the franchise will open within the estimated timeframe. Numerous factors can affect the start-up period, including securing a suitable site, obtaining financing, constructing the premises, getting building permits, complying with zoning and local ordinances, and the delivery and installation of equipment, fixtures, and signage.

Furthermore, B Bops must inspect and approve the franchise premises before operations can begin. If B Bops determines that construction has not followed their plans and specifications, they can delay the opening until the franchisee makes the necessary corrections at their own expense. Therefore, while promptly starting construction is important, other factors and B Bops's approval of the construction are also critical for meeting the estimated opening times.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.