Which sections of the Atwell Suites License Agreement outline the franchisee's responsibilities for site development and other pre-opening requirements?
Atwell_Suites Franchise · 2025 FDDAnswer from 2025 FDD Document
| Obligation | Section In Agreement | Item In Disclosure Document |
|---|---|---|
| c. Site development and other pre-opening requirements | License: 13.J & Attachment “B” MTSS: 4.3, 4.4 & Attachment 4-3 to Schedule 4 | Items 7 and 11 |
Source: Item 9 — Franchisee's Obligations (FDD pages 73–75)
What This Means (2025 FDD)
According to Atwell Suites's 2025 Franchise Disclosure Document, a franchisee's responsibilities for site development and other pre-opening requirements are detailed in specific sections of the License Agreement and related documents.
Specifically, License Section 13.J and Attachment “B” outline these responsibilities. Additional details can be found in the MTSS (presumably the Minimum Technical Standards and Specifications) Sections 4.3, 4.4, and Attachment 4-3 to Schedule 4.
For prospective franchisees, this means that understanding these sections is crucial before signing the agreement. These sections likely cover aspects such as obtaining necessary permits, adhering to brand standards during construction, and ensuring the site meets all operational requirements before opening. Item 7 and 11 of the disclosure document also provide relevant information.