factual

Does Alloy have to provide consent to a proposed site for a new facility?

Alloy Franchise · 2025 FDD

Answer from 2025 FDD Document

  • A. Facility; Site Under Control. You are responsible for leasing a site that meets our site selection guidelines. We must consent to the site in writing. You may not use the Facility

premises for any purpose other than the operation of an ALLOY Facility during the term of this Agreement or any Interim Period. We make no guarantees concerning the success of the Facility located on any site to which we consent.

You may not open your Facility for business until we have notified you in writing that you have satisfied your pre-opening obligations as set forth in subparagraphs 5.A and 5.B and we have consented to your opening date. We are not responsible or liable for any of your pre-opening obligations, losses or expenses you might incur for your failure to comply with these obligations or your failure to open by a particular date.

Without limiting the generality of the prior paragraph, you must promptly after obtaining possession of the site for the Facility: (i) contact and retain our designated construction manager or an architect that meets our approval and have prepared and submitted for our approval a site survey and basic architectural plans and specifications consistent with our general buildout, image, color scheme and décor requirements as set forth in the Manuals for an ALLOY Facility (including requirements for dimensions, exterior design, materials, interior design and layout, equipment, fixtures, furniture and signage); (ii) purchase or lease and then, in the construction of the Facility, use only the approved building materials, equipment, fixtures, audio visual equipment, furniture and signage; (iii) complete the construction and/or remodeling, equipment, fixtures, furniture and sign installation and decorating of the Facility in full and strict compliance with plans and specifications we approve and all applicable ordinances, building codes and permit requirements without any unauthorized alterations; (iv) obtain all customary contractors' sworn statements and partial and final waivers, obtain all necessary permits, licenses and architectural seals and comply with applicable legal requirements relating to the building, signs, equipment and premises, including, but not limited to, the Americans With Disabilities Act; and (v) obtain and maintain all required zoning changes, building, utility, health, sanitation, and sign permits and licenses and any other required permits and licenses.

Any change to the plans or any replacement, reconstruction, addition or modification in the space, interior or exterior decor or image, equipment or signage of the Facility to be made after our consent is granted for initial plans, whether at the request of you or of us, must be made in accordance with specifications that have received our prior written consent.

Source: Item 23 — RECEIPTS (FDD pages 69–245)

What This Means (2025 FDD)

According to Alloy's 2025 Franchise Disclosure Document, Alloy must provide written consent to the site a franchisee selects for their Alloy facility. The franchisee is responsible for leasing a site that meets Alloy's site selection guidelines. Alloy makes no guarantees concerning the success of the facility located on any site to which they consent.

Furthermore, franchisees cannot open their Alloy facility for business until Alloy has notified them in writing that they have satisfied their pre-opening obligations and Alloy has consented to the opening date. Alloy is not responsible or liable for any pre-opening obligations, losses, or expenses a franchisee might incur for failure to comply with these obligations or failure to open by a particular date.

Additionally, after obtaining possession of the site for the Alloy facility, franchisees must promptly contact and retain Alloy's designated construction manager or an architect that meets Alloy's approval. They must also have prepared and submitted for Alloy's approval a site survey and basic architectural plans and specifications consistent with Alloy's general buildout, image, color scheme, and décor requirements as set forth in the manuals. Any changes to the plans or any replacement, reconstruction, addition, or modification in the space, interior or exterior decor or image, equipment, or signage of the facility to be made after Alloy's consent is granted for initial plans must receive Alloy's prior written consent.

Disclaimer: This information is extracted from the 2025 Franchise Disclosure Document and is provided for research purposes only. It does not constitute legal or financial advice. Consult with a franchise attorney before making any investment decisions.