What is the estimated range for building and build-out costs for a 7 Brew location?
7_Brew Franchise · 2025 FDDAnswer from 2025 FDD Document
| Type of expenditure | Amount | Method of payment | When due | To whom payment is to be made |
|---|---|---|---|---|
| Building / Build-Out Costs (Note 2) | $318,500 to $600,000 | Lump sum or financed | As incurred | Our Affiliate or Third Parties (your landlord and/or contractor) |
Source: Item 7 — ESTIMATED INITIAL INVESTMENT (FDD pages 23–27)
What This Means (2025 FDD)
According to 7 Brew's 2025 Franchise Disclosure Document, the estimated building and build-out costs range from $318,500 to $600,000. These costs encompass the construction of a modular building and the installation of related signage. The payment can be made in a lump sum or financed, and is due as incurred. Payments are made to 7 Brew's affiliate or third parties, such as the landlord or contractor.
It's important to note that these figures do not include potential real estate purchase costs if a franchisee chooses to buy the property rather than lease it. Also, freight costs for modular buildings can range up to $30,000 per building, and installation costs can also range up to $30,000 per building. The higher end of the building cost range is for hurricane-resistant designed buildings for use in coastal areas. These freight and installation costs are in addition to the estimated ranges appearing in the table.
Site development costs, which are separate from building costs, range from $200,000 to $800,000 and include developing the land and other site improvements like landscaping, electrical and water hookups, paving, and sidewalks. Architectural and engineering fees are estimated to be between $10,000 and $60,000. These costs, along with building costs, can be significantly impacted by factors such as location, local regulations, and any necessary site improvements.
Prospective franchisees should carefully consider these costs and consult with business advisors to fully understand the potential financial investment required to establish a 7 Brew location. They should also inquire about any additional fees or costs that may not be explicitly included in the provided estimates, such as government-imposed impact fees or the costs associated with bringing utilities to the property.